FCL — Full Container Load
20'DV, 40'DV, 40'HC, 45'HC and special equipment to Port Sudan.
- Open Top and Flat Rack for out-of-gauge cargo
- Reefer containers for cold chain
- Empty equipment supply and stock monitoring
We move full containers and part loads to Port Sudan. For cargo that does not fill a container we run a weekly consolidation service, and even a single pallet is accepted. Out-of-gauge cargo travels on Open Top and Flat Rack; cold chain goes in reefer containers.
20'DV, 40'DV, 40'HC, 45'HC and special equipment to Port Sudan.
Weekly groupage service for cargo below a full container.
Bonded handling at origin and destination.
Times below are port-to-port and indicative, not door-to-door; they vary by service, transshipment hub and season. Binding transit times are confirmed with the quotation.
| Loading Region | Ports of Departure | Arrival | Indicative Transit | Note |
|---|---|---|---|---|
| Turkey | Mersin, Istanbul (Ambarli), Izmir | Port Sudan | 18–28 days | via Jeddah or Jebel Ali transshipment |
| China | Shanghai, Ningbo, Shenzhen, Qingdao | Port Sudan | 35–37 days | busiest lane, weekly service |
| UAE / Gulf | Jebel Ali, Sharjah, Dammam | Port Sudan | 7–14 days | short transit, fast transshipment |
| Saudi Arabia | Jeddah, Yanbu | Port Sudan | 2–5 days | opposite Red Sea shore; fastest option |
| North Europe | Hamburg, Rotterdam, Antwerp | Port Sudan | 28–38 days | via Suez with transshipment |
← →
Containers from Mersin or Istanbul typically reach Port Sudan in 18–28 days. The transit depends on the transshipment hub — usually Jeddah or Jebel Ali — and on service frequency. A binding transit time is confirmed with the quotation.
From the main Chinese ports to Port Sudan, transit generally runs 35–37 days. Rate levels shift from period to period, and we provide the current level at the time of enquiry.
Use our LCL consolidation service. Even a single pallet is accepted, and pricing is transparent on a CBM or W/M basis. Consolidation runs through Mersin, Istanbul, Jeddah and Jebel Ali.
Yes. Port Sudan is the country's principal seaport and handles roughly 90% of its foreign trade. Transshipment operations resumed in mid-2026, the terminal received large-capacity container vessels for the first time, and in June 2026 it handled over 26,000 TEU across 30 ship calls. Berth depth and capacity constraints nevertheless persist, so we obtain current service confirmation for every shipment.